Amigos of the Marlo Cuevas-Balandran Activity Center
Projects Completed
Wants and Needs




Projects Completed

Thanks to many for supporting
Amigos of the Marlo Cuevas-Balandran Activity Center!

The following projects have been completed with
donations and in conjuction with donors wishes.

First Floor

Rolling counter doors installed
Wood kitchen cabinets with stainless steel top,
sink and faucets
1 8' x 30" stainless steel table with 6" backsplash with two drawers
2 Ten burner stoves
2 Ovens - Convection
1 Warmer
1 Three compartment refrigerator
1 Two compartment refrigerator
1 8' x 30" stainless steel table with two drawers
1 6' x 30" stainless steel table
2 Hand sinks
1 Three compartment sink with faucets and drains
1 Drying rack for pots and pans
4 6" stainless steel tables across from stoves
Carts for tables and chairs - not assembled yet
PLUS
Baby Changing Stations are in both restrooms
Elevator in full operation
Volleyball poles are installed - per Booster Club


Downstairs Kitchen

Wood kitchen cabinets with stainless steel top,
faucets and sinks
30 Round tables
1 8' x 30" stainless steel table with two drawers
1 6' x 30" stainless steel table
1 14" x 12' stainless steel wall shelf under rolling counter
door - kitchen side
1 Two compartment refrigerator
1 Dryer rack
1 Rolling counter door - Installed
1 Three compartment sink - needs to be hooked up
1 Hand sink

info@amigosofmcbac.org
Copyright 2007